Suche

Suchergebnisse

2604 results:
  • 601. QM processes
    Date: 06.08.2025
    There is a process description for each individual process. The quality assurance processes are divided into Core processes Process of establishing study programmes Study programme concept (development and elaboration) Process of accreditation and reaccreditation of study programmes Selection of experts Quality assurance during t
  • 602. QM processes
    Date: 06.08.2025
    Process models 5955 Decision-makers, institutions and stakeholders 5956
  • 603. QM processes
    Date: 06.08.2025
    In addition to the presentation of the process models and the process descriptions, you will also find the decision-makers, organisations and stakeholders involved in the QM processes.
  • 604. QM processes
    Date: 21.12.2021
    QM processes Process management deals with the identification, modelling, description, introduction, control and improvement of processes within the framework of the quality management system in studies and teaching. The quality assurance processes within the QMS apply to all departments, institutions and other organisational units at Kaisersla
  • Purchase of a heat treatment furnace for the materials science laboratory The materials science laboratory is equipped with a notched impact hammer and a device for the Jominy face quenching test, which are basic tools in materials science education. Particularly, bcc materials tend to have a strongly temperature-dependent strength behaviour, wh
  • back
  • Purchase of a heat treatment furnace for the materials science laboratory The materials science laboratory is equipped with a notched impact hammer and a device for the Jominy face quenching test, which are basic tools in materials science education. Particularly, bcc materials tend to have a strongly temperature-dependent strength behaviour, wh
  • Pump test bay with integrated sensor technology: The test bench is suitable for carrying out long-term tests on up to three pumps simultaneously, especially for recording the temperatures of the pumps, the flow rates and the pressures before and after the pumps. By means of a valve it is possible to constrict the pipeline so that the flow resi
  • Pump test bay with integrated sensor technology: The test bench is suitable for carrying out long-term tests on up to three pumps simultaneously, especially for recording the temperatures of the pumps, the flow rates and the pressures before and after the pumps. By means of a valve it is possible to constrict the pipeline so that the flow resi
  • Publications 2014 C. Banzhaf, M. Grieb, A. Trautmann, A. Bauer, L. Frey, Influence of Diverse Post-Trench Processes on the Electrical Performance of 4H-SiC MOS Structures, Materials Science Forum. 778–780 (2014) 595–598. https://doi.org/10.4028/www.scientific.net/MSF.778-780.595. C.T. Banzhaf, M. Grieb, A. Trautmann, A.J. Bauer, L. Frey, Inv
The search query was processed in 207 ms.